| Return to Form | |||
|
Number of Mailboxes:
|
||
| SYSTEM DESCRIPTION | VALUE COMPARISON | HP | SYSTEM 1 |
| Hardware Infrastructure Platform | |||
| Server Platform | |||
| CPU | |||
| System Memory | |||
| Storage Platform | |||
| Storage Architecture | |||
| RAID Level | |||
| Messaging User Profile | |||
| Mailbox Size | |||
| Total Solution Footprint | |||
| Number of Power Supplies | |||
| Number of Fans | |||
| Preconfigured out of the factory with pre-sized servers, storage and networking for specific mailbox count, all based on Microsoft Best Practices? | Reduction in planning and design time with potential for as much as 87% improvement compared to traditional platforms for Exchange | ||
| Preconfigured 2 copy DAG for High Availability? | Reduction in installation and deployment time with potential for as much as 60% improvement over traditional platforms for Exchange | ||
| Includes 3 Year 24 x 7 hardware AND software support including Microsoft Windows Server and Exchange Server with Next Business day on-site hardware response covering all hardware and software - as part of the Single SKU solution | Single Go-To Resource for support needs, potential improvement in maintenance costs and TCO | ||
| Time and Cost with a Traditional Approach to designing and installing an Exchange deployment |
Projected IT (if managed internally) Hours Costs |
Outsourcing Cost (if used) | Potential Improvement with E5000 vs Traditional Platforms for Exchange * |
| Planning & Design |
0 hours $0.00 |
$0.00 | E5000 Messaging System "Requires 87% fewer steps to size and define solution" |
| Installation & Deployment |
0 hours $0.00 |
$0.00 | "Integrated solution reduces installation steps by approximately 60% compared with traditional approach" |
| Total |
0
$0.00
|
||
|
* Potential improvements in Planning and Installation based on Tolly Report, March 2011
|
|||
| Return to Form | |||